Coldham Windfarm was constructed in 2005 and is a joint project between ScottishPower Renewables and the Co-Operative Group.
At Coldham Windfarm, there are eight Vestas turbines, capable of generating up to 16 megawatts of cleaner greener energy.

Turbines
08
Megawatts
16